| October 26, 2023 | Complaint inspection | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of November 30, 2023. |
| October 26, 2023 | Complaint inspection | Ensure food and drink is palatable, attractive, and at a safe and appetizing temperature. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of November 30, 2023. |
| January 9, 2024 | Complaint inspection | Ensure services provided by the nursing facility meet professional standards of quality. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 26, 2024. |
| January 9, 2024 | Complaint inspection | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 26, 2024. |
| January 9, 2024 | Complaint inspection | Provide appropriate pressure ulcer care and prevent new ulcers from developing. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 26, 2024. |
| March 8, 2024 | Standard (routine) inspection | Honor the resident's right to a dignified existence, self-determination, communication, and to exercise his or her rights. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of April 29, 2024. |
| March 8, 2024 | Standard (routine) inspection | Honor the resident's right to voice grievances without discrimination or reprisal and the facility must establish a grievance policy and make prompt efforts to resolve grievances. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of April 29, 2024. |
| March 8, 2024 | Standard (routine) inspection | Ensure residents do not lose the ability to perform activities of daily living unless there is a medical reason. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of April 29, 2024. |
| March 8, 2024 | Standard (routine) inspection | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of April 29, 2024. |
| March 8, 2024 | Standard (routine) inspection | Provide appropriate care for residents who are continent or incontinent of bowel/bladder, appropriate catheter care, and appropriate care to prevent urinary tract infections. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of April 29, 2024. |
| March 8, 2024 | Standard (routine) inspection | Provide safe and appropriate respiratory care for a resident when needed. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of April 29, 2024. |
| March 8, 2024 | Standard (routine) inspection | Ensure medication error rates are not 5 percent or greater. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of April 29, 2024. |
| March 8, 2024 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of April 29, 2024. |
| March 8, 2024 | Standard (routine) inspection | Ensure food and drink is palatable, attractive, and at a safe and appetizing temperature. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of April 29, 2024. |
| April 15, 2024 | Complaint inspection | Honor the resident's right to share a room with spouse or roommate of choice and receive written notice before a change is made. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of April 18, 2024. |
| October 23, 2024 | Complaint inspection | Respond appropriately to all alleged violations. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 8, 2024. |
| December 3, 2024 | Complaint inspection | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 31, 2024. |
| January 24, 2025 | Standard (routine) inspection | Not transfer or discharge a resident without an adequate reason; and must provide documentation and convey specific information when a resident is transferred or discharged. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 6, 2025. |
| January 24, 2025 | Standard (routine) inspection | Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 6, 2025. |
| January 24, 2025 | Standard (routine) inspection | Assist a resident in gaining access to vision and hearing services. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 6, 2025. |
| January 24, 2025 | Standard (routine) inspection | Provide care or services that was trauma informed and/or culturally competent. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 6, 2025. |
| January 24, 2025 | Standard (routine) inspection | Provide the appropriate treatment and services to a resident who displays or is diagnosed with dementia. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 6, 2025. |
| January 24, 2025 | Standard (routine) inspection | Provide timely, quality laboratory services/tests to meet the needs of residents. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 6, 2025. |
| January 24, 2025 | Standard (routine) inspection | Administer the facility in a manner that enables it to use its resources effectively and efficiently. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 24, 2025. |
| January 24, 2025 | Standard (routine) inspection | Keep all essential equipment working safely. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of February 6, 2025. |
| May 20, 2025 | Complaint inspection | Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of May 20, 2025. |
| November 20, 2025 | Standard (routine) inspection | Assess the resident completely in a timely manner when first admitted, and then periodically, at least every 12 months. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of December 5, 2025. |
| November 20, 2025 | Standard (routine) inspection | PASARR screening for Mental disorders or Intellectual Disabilities | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 5, 2025. |
| November 20, 2025 | Standard (routine) inspection | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 5, 2025. |
| November 20, 2025 | Standard (routine) inspection | Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 5, 2025. |
| November 20, 2025 | Standard (routine) inspection | Ensure medication error rates are not 5 percent or greater. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 5, 2025. |
| November 20, 2025 | Standard (routine) inspection | Ensure that residents are free from significant medication errors. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 5, 2025. |
| November 20, 2025 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 5, 2025. |
| November 20, 2025 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 5, 2025. |
| January 21, 2026 | Complaint inspection | Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of January 30, 2026. |
| March 12, 2026 | Complaint inspection | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 26, 2026. |