| April 27, 2023 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of May 25, 2023. |
| May 9, 2024 | Standard (routine) inspection | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of June 1, 2024. |
| May 9, 2024 | Standard (routine) inspection | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of June 1, 2024. |
| May 9, 2024 | Standard (routine) inspection | Provide appropriate care for a resident to maintain and/or improve range of motion (ROM), limited ROM and/or mobility, unless a decline is for a medical reason. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of June 1, 2024. |
| June 25, 2026 | Standard (routine) inspection | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of July 15, 2026. |
| June 25, 2026 | Standard (routine) inspection | Provide care and assistance to perform activities of daily living for any resident who is unable. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of July 15, 2026. |
| June 25, 2026 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of July 15, 2026. |
| June 25, 2026 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of July 15, 2026. |