| January 26, 2023 | Standard (routine) inspection | Provide appropriate pressure ulcer care and prevent new ulcers from developing. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 23, 2023. |
| January 26, 2023 | Standard (routine) inspection | Provide appropriate care for a resident to maintain and/or improve range of motion (ROM), limited ROM and/or mobility, unless a decline is for a medical reason. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 23, 2023. |
| January 26, 2023 | Standard (routine) inspection | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 23, 2023. |
| January 26, 2023 | Standard (routine) inspection | Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 23, 2023. |
| January 26, 2023 | Standard (routine) inspection | Implement gradual dose reductions(GDR) and non-pharmacological interventions, unless contraindicated, prior to initiating or instead of continuing psychotropic medication; and PRN orders for psychotropic medications are only used when the medication is necessary and PRN use is limited. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of February 23, 2023. |
| January 26, 2023 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 23, 2023. |
| December 13, 2024 | Standard (routine) inspection | Reasonably accommodate the needs and preferences of each resident. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 27, 2024. |
| December 13, 2024 | Standard (routine) inspection | Allow residents to easily view the nursing home's survey results and communicate with advocate agencies. | Potential for more than minimal harm, widespread (F) | The home has a recorded correction date of December 27, 2024. |
| December 13, 2024 | Standard (routine) inspection | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 19, 2024. |
| December 13, 2024 | Standard (routine) inspection | Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 27, 2024. |
| February 5, 2025 | Complaint inspection | Protect each resident from all types of abuse such as physical, mental, sexual abuse, physical punishment, and neglect by anybody. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 12, 2025. |
| February 5, 2025 | Complaint inspection | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 12, 2025. |
| October 15, 2025 | Complaint inspection | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of October 24, 2025. |