| January 19, 2023 | Standard (routine) inspection | Coordinate assessments with the pre-admission screening and resident review program; and referring for services as needed. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 10, 2023. |
| January 19, 2023 | Standard (routine) inspection | Develop and implement policies and procedures for flu and pneumonia vaccinations. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 17, 2023. |
| November 7, 2023 | Complaint inspection | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of November 27, 2023. |
| April 16, 2024 | Standard (routine) inspection | Ensure residents do not lose the ability to perform activities of daily living unless there is a medical reason. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of May 8, 2024. |
| April 16, 2024 | Standard (routine) inspection | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of May 7, 2024. |
| February 26, 2026 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 26, 2026. |
| February 26, 2026 | Standard (routine) inspection | Arrange for the provision of hospice services or assist the resident in transferring to a facility that will arrange for the provision of hospice services. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 26, 2026. |
| February 26, 2026 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of March 26, 2026. |